DSV AIR / Middlesex

DSV AIR Case StudyClient: DSV AIR LTD

Location: SUNBURY MIDDLESEX UK

Project: Complete installation fit out (bare shell) clients HQ site relocation.

Scope of works:

DSV AIR complete network installation
  • Project managed from outset to completion. Delivered on time and to budget.
  • Installation of cable containment systems consisting of high level Cablofil basket cable routes throughout.
  • Installation of triple compartment Rehau skirting dado trunking systems 250 metres.
  • Design and implementation of structured wired Cat 5e local area network cab to floor port (700+ outlets).
  • Installation of 128 pair tie voice cable connections, providing connectivity between BT meridian telephone switch and structured voice cabling system.
  • Complete comms room configuration, installation of passive and active networking equipment cabinets/racks/power distribution.
  • Installation of comms room (UPS) uninterruptable power supply system.
  • installation of all under desk cable management.
  • Installation of under desk power distribution.
  • Patching of all end users comms cab to desk network connections over weekend providing a seamless move in, minimising disruption to the clients business.
  • Fire sealing of all cable access routes.
  • Managed on site health & safety procedures.
  • Tested full installation using Fluke DTX 1800 cable analyser.
  • Provided comprehensive schedule of test results and O&M manuals to client to EIA/TIA industry standards.